Shipping Terms
Avoiding Short Landed Shipments: Essential Tips
A situation when only a part of the entire cargo has arrived at the destination, even though the whole shipment was loaded/shipped together, is known as short land.
A container that is short land means that it has been left on board a shipping vessel in spite of the vessel arriving at the port of call that the container was meant to be unloaded at.
If the vessel is horribly behind schedule, it may have to do what is known in the shipping business as a "cut and run." This means the vessel must go in order to make later legs in its schedule even though unloading operations have not been completed; reasons this could occur could be bad weather at the port, an accident or issues with the dock staff can all lead to delays that the ship cannot accept in their schedule. Inconsistencies in documentation can lead to a short land. If a consignee of a container was required to be at the port to accept the delivery but did not show up in time, then the port may not accept the container. This forces it to be left onboard the shipping vessel.
A
Average Payment Period (for materials)
Average Inventory
Average Cost per Unit
Accounts Payable
Available to Sell (ATS)
Available to Promise (ATP)
Available Inventory
Automatic Rescheduling
Automatic Relief
Automated Storage-Retrieval System (AS-RS)
Automated Manifest System (AMS)
Automated Guiding Vehicle System (AGVS)
Automated Commercial Environment (ACE)
Automated Clearing House (ACH)
Automated Call Distribution
Automated Broker Interface (ABI)
Auditing
Audit Trail
Audit Ability
Audit
Attributes
Attachment
Assumed Receipt
Association of American Railroads
Assignment
Assemble-to-order
Arrival Notice
Approved Vendor List (AVL)
Appraisal Costs
Any Quantity Rate (AQ)
Anticipation Inventories
Anticipated Delay Report
Anti-Dumping Duty
ANSI Standard
Amtrak
American Waterways Operators
American Trucking Association (ATA)
American Standard Code for Information Interchange
American Society of Transportation & Logistics
American Society for Training and Development (ASTD)
American Society for Testing and Materials (ASTM)
American Society for Quality (ASQ)
American National Standards Institute (ANSI)
American Customer Satisfaction Index (ACSI)
Alternate Routing
Alpha Release
Allocation
Allocated Item
All Risks
All Cargo Carrier
Alaskan Carrier
Airport and Airway Trust Fund
Airline Terminal Fee (ATF)
Air Waybill
Air Transport Association of America
Air Taxi
Air Cargo Containers
Air Cargo
Agility
Agile Manufacturing
Aggregate Tender Rate
Aggregate Planning
Aggregate Plan
Aggregate Inventory Management
Aggregate Inventory
Aggregate Forecast
Agglomeration
Agent
Agency Tariff
After Sale Service
Advanced Shipping Notice
Advanced Planning and Scheduling (APS)
Advance Material Request
Adaptive Smoothing
Adaptive Control
Actual to Theoretical Cycle Time
Actual Demand
Actual Cost System
Actual Cost
Activity Ratio
Activity Network Diagram
Activity Level
Activity Driver
Activity Dictionary
Activity Based Planning (ABP)
Activity Based Management (ABM)
Activity Based Costing System
Activity Based Costing Model
Activity Based Costing (ABC)
Activity Based Budgeting (ABB)
Activity Analysis
Activity
Active Inventory
Avoiding Short Landed Shipments: Essential Tips
More From Cogoport
Schedule a personalized 1:1
Step into the future of freight forwarding with Cogoport. Experience a demo tailored to revolutionize your logistics, offering:
- Innovative Solutions: Peek into cutting-edge features redefining freight management.
- Expert Guidance: Direct insights from our seasoned pros, tailored to your business needs.
- Real Answers: Interactive session to address your unique challenges.